SIMCO Company has finished design, production, installation and implementation of 132 KV cable line project in Kish Island by using its specialized experts as a EPC(turn-key) project ....



SIMCO Company has finished design, production, installation and implementation of 132 KV cable line project in Kish Island by using its specialized experts as a EPC(turn-key) project.
This project consist of 2 way, once from shore to Mir Mohana with 8 km length and another’s from shore to Sadaf with 5.8 km length.
Cables in all of the way in the form of 3-phase 3-circuit Installed within the channel or direct burial.

This project characteristic is as follows:

1)      Cable characteristic : 1×500 mm2  N2XSYBY  132 KV

2)      Running length : 150 km

3)      Number of Installed joint : 261

4)      Implementation year : 2008 to 2012

5)      Employer : Kish Free Zone Organization

6)      Consulting: Consulting engineers company of  electrical industry development

7)      Subcontractors : Kish electricity power control company